Project: Voltar-S21   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2375.6
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Nov 12, 2022     PMAG Wiring Reprise - (3 hours) Category: Avionics
After a long discussion with Emagair's Brad Dement, I decided to simplify the PMag wiring and just use the Klixon breakers to kill power for testing. I also replaced the switch that was intended to control a MAP air valve with just a curve A/curve B switch connected to the PMag serial lines.

I am also planning on putting connectors on the panel for the L & R PMag serial ports. I'll use the EICAD software on my laptop for PMag configuration and timing customization, connected to these ports. The ports will be on a 2" blank, occupying one of the MFD instrument positions. Eventually, I will develop a complete controller using a huVVer-AVI instrument to replace the external laptop.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.